Sheet piling project at Mohembo Bridge in Botswana

 Piling 

 

The sheet piling project, undertaken for the Itinera and Cimolia JV at the Mohembo Bridge in Botswana, included:

  • the installation of the original two boxes around the bridge towers and the quay wall;
  • the installation and removal of the sheet pile walls on the sides of fourteen piers;
  • the installation and removal of three additional boxes around three piers of the bridge; and
  • the installation and removal of two sheet piles walls for the fixing of the riverbanks to the construction sites.

 

Skills

Posted on

July 4, 2023